After a rain soaked drive to Potter's, the pasture was surprisingly bone dry. CQ and I met up with Mitch Kline and around 7 a.m. We had a leisurely morning ride and hopefully Mitch captured some good images.
After the morning ride, we headed over to the south portion of the pasture to work on a new addition to Hornitos. The new section bypasses the frequently flooded and heavily overgrown lower section by the road.
Done. You can see a "ramp" on the left side of the rut. With a little dirt work and a bridge back across to the right, the trail will come out just above the old swamp. The benefit is a more interesting trail, no regular mowing, and no constant mud.
Ride time for tomorrow is 10:00 a.m., more trail work is on the agenda, this time we'll be working over on Horseshoe Canyon if anybody wants to join us.
No comments:
Post a Comment