It sounds like a lot of the crew will be out at Potter's on Monday to do some trail work. Paul is camping out, the Coyote may make an appearance, and numerous others will be out. Come if you can, bring your trimmers, push mowers (some trails can't be accessed with the brush hog), and weed whackers.
Paul made some notes from his last trip to the pasture about what needs to be done;
"Need to hit the access trails and the local favorites first.
Trails to chain saw; Church Grove and cut off, South end of Trail Ridge by the pew, Sweetness, Tripple By-Pass, Potters Perfection the down hill single trk (which was the old way up it), and theres 200 ft left to trim in the middle of Zipper. That would be a good start.
Trails to weed eat; Horse Shoe Canyon (push mower), Rip-Off Ridge, there's three flat sections by the barbed wire fence on First Way by the dirt road, if we dont get to them soon we'll lose them till spring, the middle section of Tunnel vission in the woods, there's a grassy section about 300 ft long."
I would add that Cedar Ridge needs chainsaw and dirt work and 6 Guy needs some trimming near the drop off at the bottom.
Hope to see everyone trimming AND riding this week.